Skip to content

AI agent for machine and plant builders

KoAssist keeps yourproject memory.

KoAssist reads the specification, emails and minutes for every project, keeps the status current for the whole team and puts up what needs deciding.

  • No-obligation conversation
  • Hosted in Germany
  • No training on your data
Sample project with demo data
As seen in
Project memory

The project status in one place

Drop a specification and the first documents. KoAssist reads them, builds the project status and puts up whatever changes, every item with its source.

Try it yourself: click through a sample project.
New project
P-2604 · Assembly line 3

Drop the specification and the first documents. KoAssist reads them and builds the project from them.

Click to start the demo
Sample project with demo data
In the project

What KoAssist takes off your team.

KoAssist prepares, the project decides. Nothing is adopted or sent until someone on the team approves it.

  • Recognises emails for the project

    When an email fits a project, KoAssist asks whether it belongs there and proposes the changes. Only what someone accepts becomes valid.

    Email RE: Acceptance assembly line L303.11.2026 · open until 17.11.
    • ChangeMilestone Acceptance
      14.11.2026 → 21.11.2026
      “We can only accept the line on 21 Nov.” · Page 1
    • NewOpen item
      Release hall floor for delivery
    • DoneCommitment
      Hall 2 layout sent to the customer
    Apply all (3)Discard
  • Takes in news from anyone on the team

    Whoever knows something new tells the project. KoAssist files it, updates schedule and status, and everyone on the team sees it.

    TW
    Tom WagnerAssembly· today, 11:20
    Motor M1 won't arrive until 14 Nov, the supplier has pushed it back.
    Filed in P-2604
    • ScheduleDelivery motor M1 7 Nov → 14 Nov
    • AffectsStart of assembly line 3
    • Visible toTeam P-2604 · 6 people
    AcceptLater
  • Sends a briefing every morning

    On working days at 6:30 an email arrives with the link. What is due today you handle with one click.

    Tuesday, 3 November
    Good morning, Lena.
    To do today0 of 2 done
    P-2604 Assembly line 3Milestoneoverdue for 2 days
    Enclosure release was planned for 1 Nov. Reached?
    ReachedNew dateLater
    Reached. The project is up to date.
  • Collects the questions for the customer

    What is missing in the documents goes on a list for the customer. KoAssist sends nothing, you copy it into your email.

    Questions for the customer
    KoAssist sends nothing. You download the list or copy the text into your email.
    On the list3
    Machine
    1. 1
      Which IP rating does the control cabinet need?
      Enter answerRemove from list
    2. 2
      How long may a changeover take?
    3. 3
      Who accepts the line at the customer's site?
On assignment

What you ask KoAssist to check.

Ask every earlier project.

Knowledge Assistant

Answers from every earlier project, backed by file and page.

View knowledge assistant
Engineering
Engineering
How can I help you today?
Which project did we use a Siemens controller in?

Check every drawing before release.

Drawing Checker

Against your engineering guidelines, every finding marked on the drawing.

View drawing checker
Technical drawing of a drive shaft from the fictional Musterbau GmbH: 245 mm long, Ø25 bearing seats, keyway 8 P9, material 42CrMo4+QT.
WarningTitle block96%

Spelling error in the part name

“Antriebswele” instead of “Antriebswelle”.

Real errorNot an error
NoteISO 7200Rule

No revision status entered

The “REV” field in the title block is empty.

Real errorNot an error

Find parts that already exist.

Similar-Part Search

Similar parts from your stock, with drawing number and material.

View similar-part search
Does a part like this already exist?
Describe it before you design it.
e.g. shaft with keyway, 200 mm
CategoryFlange 16Plate 15Shaft 15Bracket 13Cover 8
Search the inventory
SO-2015Drive shaft D20 × 180, 2 keyways93%
SO-7031Drive shaft D25 × 240, keyway on both ends91%
Customer voices
The simple operation and modular structure help us pool knowledge, research projects faster and get started on project engineering more easily. What we value most is that the answers are backed by sources and traceable at any time.
René Hedrich, Managing Director, Roschiwal + Partner
Read the case study
The way to KoAssist

Test KoAssist on a real project.

You judge KoAssist on your own project, with measured results and no commitment.

  1. 30 minutes

    First conversation

    You bring a specification, we show KoAssist on your documents.

  2. 60 days

    Pilot on one project

    On a running or upcoming project. To start, uploading the documents is enough.

  3. Then

    Decision based on results

    Measured on day one and after 60 days. You decide whether to continue.

  • No commitment
  • Hosting in German data centres
  • No training on your data
Technical setup

What your IT needs to do.

KoAssist replaces no system. It attaches to the repositories your knowledge already sits in, and reads from them.

  1. You decide where the knowledge sits

    SharePoint, network drives, PDM, project folders. That is the real preparation, and nobody can do it for you: only your people know which repository actually counts.

  2. We connect the sources

    Through open interfaces, a whole folder at a time, straight from SharePoint or a network drive.

  3. Permissions stay as they are

    They come from your directory service. Anyone who cannot open a document in the source system will not see it in KoAssist either.

  4. After that it runs alongside

    New and changed documents are picked up on their own, deleted ones disappear with them. Your engineers carry on exactly as before.

Integrations

Connected to the systems you already use.

SharePoint, OneDrive, Google Drive, Outlook and network drives, plus interfaces to ERP, PDM and PLM. KoAssist works with the systems your knowledge lives in today.

No system migration
Your systems stay authoritative. KoAssist syncs from them instead of replacing them.
Automatic sync
New and changed documents come in on their own.
Setup in under two weeks
From onboarding to the first answer.
SOLIDWORKS PDM
SharePoint
OneDrive
Google Drive
Outlook
Autodesk Vault

Your data stays in Europe.

GDPR-compliant

Data processing agreement under Art. 28 GDPR as standard, TOMs attached.

Hosted in Germany

ISO 27001 certified data centres, no transfers to third countries.

No training on your data

Your documents never improve a language model. Contractually guaranteed.

Deletion within 48 h

On written request all data is deleted, with a deletion log.

Yanik Yeganehfar, co-founder of KoAssist

Find out with Yanik whether KoAssist fits your projects.

Request a demo
FAQ

Answers to the most common questions

If your question isn't here, get in touch and we'll answer it directly.

How the project memory works in a project

KoAssist compared with seven other solutions

Where AI helps in engineering design today, and where it doesn't: the overview

PARTNER