Drawing check before release: a checklist for technical drawings.
What to check on a technical drawing before release, from the title block and tolerances to the revision status. A checklist from practice, with a separate section for in-house rules.
Before release, check a technical drawing in six areas. A complete title block, clear dimensioning suited to manufacturing, appropriate tolerances and fits, standard material and surface details, a consistent revision status with a change note, and compliance with your own design guidelines. The in-house rules are the hardest to check, because hardly anyone knows the whole guideline.
Contents
A bearing block goes to manufacturing. The title block gives the material as "steel", the general tolerance is missing and there is nothing on edge condition. Manufacturing calls. After ten minutes everything is cleared up. The same project, however, has 23 more sheets, and for four of them the phone rings again.
None of these mistakes is dramatic. Together they still cost time in design and in manufacturing, and sometimes a part that has to be made again.
What does a drawing check cover?
A drawing check before release answers two questions. Is the drawing complete and unambiguous, so that manufacturing can make the part without asking? And does it follow the rules that apply in the company?
Whether the part does its job is a different check. That belongs in the design review, not in the release check.
Checklist: title block
- Name and drawing number present and unambiguous
- Revision status entered and matching the bill of materials
- Material with its standard designation, such as 42CrMo4+QT rather than "steel, quenched and tempered"
- Scale given and correct
- Reference to the general tolerance, such as ISO 2768-mK
- Author, checker and date filled in
- Sheet number and number of sheets on multi-sheet drawings
Checklist: dimensioning and views
- Every dimension needed for manufacturing appears exactly once
- No closed dimension chains without a reference dimension
- Datum system recognisable and suited to manufacturing
- Sections and detail views wherever internal geometry would otherwise stay unclear
- Threads fully specified, with thread depth for blind holes
Checklist: tolerances, surfaces, edges
- Fits entered on functional surfaces, for example bearing seats
- Geometric tolerances where the function requires them, and not everywhere
- Surface specifications on functional surfaces, a general specification for the rest
- Edge condition specified, for example to ISO 13715
- Heat treatment, coating or hardness specified with the test area
Checklist: revision and change
- The change note describes what was changed, not just "adjusted"
- For customer changes, a reference to the change, such as the number from the change register
- The released version clearly distinguishable from work in progress
- Bill of materials and assembly drawing at the same revision
How customer changes stay traceable in a project is described in the article on customer changes in plant engineering. Which other checking and search tasks AI takes on in engineering design today is covered in the guide AI in engineering design.
Checklist: in-house rules
This part is the hardest to check. Every design department has rules that go beyond the standard or pin it down:
- preferred materials and semi-finished products
- requirements for holes, threads and countersinks from your own standard parts catalogue
- title block template and mandatory fields
- requirements from the customer, for example from their plant standard
- rules that came out of earlier mistakes
The problem is that these rules sit in a design guideline that often runs to 30 or 60 pages and is rarely read in full. Whoever does the check relies on what they remember.
How does the check become more reliable day to day?
A checklist that matches your guideline. The lists above are a start. Add the ten rules from your guideline that are broken most often.
Settle findings of the same kind once. If the general tolerance is missing on twelve sheets, that is one finding for the whole project, not twelve.
Record findings. A short check report per project shows which mistakes keep coming back. That becomes the next version of the checklist.
Check before the drawing goes to manufacturing, not afterwards. That sounds obvious. Yet in projects under deadline pressure the check is often pushed back to "after the order has been placed".
How does the KoAssist drawing check help?
The drawing check in KoAssist, the AI agent for machine and plant builders, has been live since November 2026. You upload your design guideline as a PDF or Word file. KoAssist proposes checkable rules from it, each with the passage in the guideline it comes from. You approve the ones that apply.
KoAssist then checks drawings against this rule set, one at a time or a whole project at once. Each finding names the rule and, where the location is unambiguous, is marked on the sheet. This also works for drawings whose text was plotted as strokes. You assess findings of the same kind in one go. You decide whether a finding counts. At the end you get a check report as a PDF.
If you would like to see how this works with your own guideline and a few of your drawings, you can book a demo.
Frequently asked questions
More from the blog
Back to overview- 15 November 2026Article5 min
Can ChatGPT analyse a customer specification?
An 80-page customer specification, and the quotation has to go out by Friday. What ChatGPT does well in the analysis, where it reaches its limits and what to settle before a customer specification ends up in a chat window.
5 min - 15 November 2026Article4 min
Backing change orders in plant engineering: how additional work from customer changes gets paid
Customer changes create additional work, and it only gets paid when it is backed by evidence. What a change order in plant engineering needs, when to submit it and which documents make the difference at the final invoice.
4 min - 15 November 2026Article4 min
How much time does coordination cost in design engineering?
Collecting status, answering questions, preparing status meetings: in design departments, coordination takes up many hours a week. Two cases from special-purpose machine building and a simple method for measuring your own effort.
4 min