Knowledge management in machine building
Every day, a machine building project creates knowledge. Much of it is written down nowhere, or only in an email. This guide explains the terms, shows the four moments in which companies lose project knowledge, and sorts methods and tools, with and without AI.
Knowledge management in machine building
The deliberate handling of what was learned in projects and through experience.
Knowledge management in machine building means capturing and passing on what was learned in projects and through experience, so the next project can build on it. It covers technical knowledge about design and standards as well as project knowledge: what the customer wanted, what was decided and why. It works through people, processes and tools at once.
What knowledge management means in machine building
The deliberate handling of an organisation's knowledge: recognising it, capturing it, sharing it and applying it. It rests on three pillars.
People
Who knows what, who passes knowledge on, and is there time for it? Without this pillar every system stays empty.
Organisation
Fixed routines: where minutes go, when a project is handed over, when lessons learned take place.
Technology
File storage, search, wiki or AI. It makes knowledge findable, but replaces neither the people nor the routines.
The international standard ISO 30401 from 2018 sets out the requirements for a knowledge management system. For technical companies, the German guideline VDI 5610 Part 1 from 2009 is closer to daily work. It is titled "Knowledge management for engineering" and describes fundamentals, concepts and how to introduce it. A well-known model by Probst, Raub and Romhardt breaks knowledge management into building blocks such as identifying, acquiring, developing, distributing, using and preserving knowledge. They all say essentially the same thing: a tool alone is not knowledge management.
In machine and plant building, one distinction is worth making that general guides leave out. Technical knowledge is knowledge about design, materials, standards and processes. It grows slowly and can be captured in guidelines and training. Project knowledge is knowledge about one particular project: what the specification says, what the customer changed later, which decision was made and why. It builds up quickly, is scattered across emails and minutes, and is hardest to find again once the project is over.
Tacit knowledge, explicit knowledge and experience
Most knowledge sits below the line. Part of it can be written down, another part can only be passed on.
Written down
Explicit knowledge
Drawings, specifications, guidelines, minutes, emails. It can be filed, searched and passed on.
In people's heads
Tacit knowledge
Judgement, intuition, knowing the customer. Those who have it apply it, but often cannot fully explain it.
Experience
The part of tacit knowledge that comes from earlier projects and years in the job. Not a third kind alongside, but a piece of it.
In design it looks like this. The fit on the drawing is explicit. Knowing that this customer always queries sealing surfaces, so you tolerate the surface tighter from the start, is tacit. The acceptance criterion in the specification is explicit. What the customer named verbally as an acceptance condition at the last commissioning is tacit.
The best-known model for this is the SECI model by Nonaka and Takeuchi. It describes four transitions: knowledge is passed on by working together, put into words, combined with other knowledge and internalised again by applying it. In practice that means two things. Part of tacit knowledge can be made explicit, another part can only be passed on by working together. No software changes that.
Why the topic is pressing in machine building now
The generation with the most experience will retire in the coming years.
2012
14.7 %
2022
20.2 %
of employees in graduate STEM occupations in Germany are over 55.
Source: VDI/IW Ingenieurmonitor 2024/II
According to the engineering monitor by VDI and the German Economic Institute (IW), the share of over-55s among all employees in graduate STEM occupations in Germany rose from 14.7 percent in 2012 to 20.2 percent in 2022. With this generation goes a large part of the experience gathered over decades of projects.
On top of that, projects in special machine and plant building are rarely alike and run for a long time. What was learned in one project is often needed again only years later, when the same customer orders a similar project. By then the person who knew it may have left the company. How this shows up in daily work is described in the article on knowledge loss through the skills shortage.
Four moments in which project knowledge gets lost
Knowledge is not lost evenly, but at particular points. Knowing them lets you act there specifically, instead of setting up a general programme.
Getting up to speed
New design engineers ask the same questions that have been answered ten times already. The answer is somewhere, but nobody finds it fast enough, so they ask the experienced colleagues.
The three questions everyone asksProject handover
A project manager changes, or a project moves from sales to engineering. What was agreed verbally does not come along.
Handover without losing knowledgeProject close
After acceptance the next project starts. The lessons learned meeting is skipped, or nobody reads its minutes.
Lessons learned that someone readsRetirement
Experienced colleagues leave and take with them the knowledge that was never written down, because it never needed to be.
Keeping project knowledge before someone leavesWhere project knowledge actually lives in machine building
Most companies already have the knowledge. It is not missing, it is scattered across five places.
| Source | Source | What it holds | Where |
|---|---|---|---|
| Specification and contracts | What the customer requires. Explicit, but often a hundred pages long and changed later. | Where: Project folder | |
| Emails | Changes, commitments and decisions. | Where: Personal inbox | |
| Minutes and notes | Meetings, acceptances, site reports. | Where: OneNote, Word, paper | |
| Drawings and file storage | Design states and approvals. | Where: PDM, SharePoint, network drive | |
| Heads | Why something was solved this way. | Where: Filed nowhere |
General guides talk about "knowledge" as if it lived in one place. In a machine building company each of the five places needs to be handled differently: decisions from email need recording in a different way than notes in OneNote.
That leads to the most important principle for any knowledge management in a technical company: first make the existing documents usable, then write new ones. A wiki that opens a sixth place next to emails, minutes and file storage tends to make the problem worse. How to bring project status in Excel, OneNote and email together is covered in a separate article.
Methods for knowledge transfer
The proven methods need no software, but time and a fixed place in the routine. Each has a limit you should know beforehand.
| Method | Good for | Where it reaches its limits |
|---|---|---|
| Tandem | Good forAn experienced and a new colleague work on the same project for weeks. The only method that reliably transfers tacit knowledge. | Where it reaches its limitsCosts the experienced colleague's time, and that is the scarcest resource. |
| Expert interview | Good forTargeted questions to a knowledge holder, written down. Makes part of tacit knowledge explicit. | Where it reaches its limitsYou only learn what you ask about. What the interviewee takes for granted is missing. |
| Exit interview | Good forBefore retirement or a move: running projects, open commitments, contacts at the customer. | Where it reaches its limitsOften comes too late and too short. What grew over decades does not fit into two meetings. |
| Knowledge map | Good forAn overview of who knows about which topic, customer or machine type. Answers "Whom do I ask?" | Where it reaches its limitsGoes out of date as soon as someone leaves or changes role, unless someone maintains it. |
| Lessons learned meeting | Good forAt project close, record what went well and what should change next time. | Where it reaches its limitsGets skipped under time pressure, and the minutes are rarely read in the next project. |
| Filing rules | Good forFixed places for minutes, customer emails and approvals in the project folder instead of the inbox. | Where it reaches its limitsOnly work as long as everyone sticks to them, and they organise knowledge without explaining it. |
Knowledge transfer means bringing knowledge from one person or team to others. How does it succeed? In practice mostly when it is tied to an occasion, such as a handover, a project close or someone leaving, rather than running alongside as an ongoing chore.
A typical case is a specialist or manager changing in the middle of a project. What needs handing over, and in which order, is described in the article on project handover in plant engineering.
Which tool is good for what, from the knowledge base to AI
More useful than a list of vendors is the question of which kind of tool fits which knowledge. There are essentially four.
| Tool | Strong at | Weak at |
|---|---|---|
| Wiki or knowledge base | Strong atLasting technical knowledge: design guidelines, standard solutions, instructions. | Weak atProject knowledge, because it has to be maintained twice and soon goes out of date. |
| File storage (SharePoint, network drive, PDM) | Strong atThe complete set of a project's documents, with permissions and versions. | Weak atFinding: you need to know which folder and which file it is in. |
| Full-text search | Strong atHits across many folders, if you know the right keyword. | Weak atQuestions in your own words. It returns a list of hits, not an answer. |
| AI with source references | Strong atQuestions in natural language to the existing documents, with an answer and a reference to file and page. | Weak atKnowledge that is written down nowhere. What is only in someone's head, it cannot find either. |
The most common failure in engineering is the knowledge base or company wiki that is out of date after a year. The reason is rarely the tool. A wiki requires someone to write down a second time what is already in emails, minutes and drawings. Under deadline pressure, that is exactly what does not happen.
Anyone planning to build a knowledge base in SharePoint should therefore first check whether the existing file storage would already be enough, if it could be searched. How that works is shown in the article on SharePoint and the network drive as project storage.
What knowledge management with AI can and cannot do
People often ask how to build a knowledge base with AI. For project knowledge, the better question is whether you need a new one at all.
An AI system that reads the existing documents, meaning specifications, emails, minutes and drawings, answers questions in your own words without anyone writing a wiki first. What matters is that it names the place for every answer: file and page. What was once in an email stays findable that way, even after the person who wrote it has left.
It does not preserve experience that was never written down. It replaces neither the tandem nor the conversation before retirement. But it can show who has written about a topic before, in other words whom to ask.
For engineering data the same applies as for any other system: where the data is processed and who can access it must be settled before rollout. More on this on the pages about AI in engineering design and GDPR compliant AI.
Introducing knowledge management in your company in five steps
Getting started works in small steps and on a real project, not with a concept for the whole company.
Identify the moments of loss
Where do your projects lose knowledge today: when people get up to speed, at handover, at project close or through retirement? One moment is enough to start.
Name the knowledge holders
Who knows about this topic, and who will leave in the next few years? A simple knowledge map is enough.
Settle the sources
Where does the explicit knowledge already live: specification, emails, minutes, file storage? Which of it is only in an inbox?
Choose one method per moment
Tandem for experience, a handover meeting for a project change, a filing rule for emails. Not everything at once.
Tool last
Only once it is clear which knowledge lives where is it worth asking about a wiki, search or AI. A tool should make existing knowledge findable, not create a second archive.
As of November 2026. Our own observations from conversations with machine and plant builders, not a measurement.
The withdrawn German specification DIN SPEC 91281 for small and medium-sized enterprises recommended a similar approach: analyse first, then start in a pilot area. The order above deliberately puts the tool last.
Where KoAssist comes in
With project knowledge, not with technical knowledge in a wiki.
KoAssist is an AI agent for machine and plant builders. Project Memory keeps the status of every project from the specification, emails and minutes: project profile, open points, decisions and risks, each entry with a reference to its source. Anything the documents do not cover appears as an open item. The knowledge assistant answers questions from the documents of earlier projects, also with file and page.
At GISCON, a special machine builder, this is how we made years of project knowledge searchable. What KoAssist does not take over: the tandem, the conversation and the time experienced colleagues need to pass things on.
Standards and figures on this page: ISO 30401:2018 (Knowledge management systems, Requirements), VDI 5610 Part 1:2009-03 (Knowledge management for engineering), DIN SPEC 91281:2012 (since withdrawn) and the VDI/IW engineering monitor 2024/II from December 2024. Research as of November 2026.
Frequently asked questions about knowledge management in machine building